Installation of the Month (May 2021): LADOT Lot 656

< Back
May 18, 2021
June 30, 2023
9:30 pm
2:35 pm
Electric Car Charging

Installation of the Month (May 2021): LADOT Lot 656

The Los Angeles Department of Transportation (LADOT) notes on its website that ICE vehicles are one of the city’s top contributors to air pollution, accounting for 19% of all greenhouse gas emissions, before proclaiming, “We can do better… We’re investing in public transit, testing new technology, and adopting mobility innovations for a cleaner environment and brighter future.” At first, it might just sound like flowery rhetoric, but we can personally attest to that commitment. Starting in 2019, LADOT partnered with us to install DCFCs at 57 city-owned lots, with almost 30% of those installations now completed. This alliance has been integral in promoting our goal of zero-emission mobility in the City of Angels by facilitating greater access to infrastructure.

EVCS CEO Gustavo Occhiuzzo on site at Lot 656

It’s because of this commitment to a sustainable future – including steps taken to electrify their entire bus fleet and advance traffic reduction measures – that we make LADOT’s City Lot 656 our featured site for May. The address is 1615 Colby Avenue in West Los Angeles and can be seen here:

https://www.google.com/maps/place/1615+Colby+Ave,+Los+Angeles,+CA+90025/@34.044509,-118.4549527,17z/data=!3m1!4b1!4m5!3m4!1s0x80c2bb6fc79226a1:0xb463ee8ffb007c9b!8m2!3d34.044509!4d-118.452764

The lot is conveniently situated near the 405 and 10 freeways in close proximity to the main UCLA campus and is walking distance from Sawtelle Japantown’s many distinct restaurants, salons, anime shops and artisan craft stores. Nearby attractions include The Getty Museum, Los Angeles National Cemetery and Mildred E. Mathias Botanical Garden. More about LADOT’s parking facilities and initiatives can be found on their website:

https://ladot.lacity.org/projects/parking-la

At Lot 656, we put four shiny new DC fast chargers in the ground, all with their own dedicated parking spots solely for EVs. These 50 kW Slim Lines feature 480 VAC three-phase input power, 6000 VAC surge protection, and an over 90% efficiency rating that will charge an EV battery to better than 80% in just one hour. The total cost of the installation, including site assessments, permitting, trenching and electrical work, ran about $400,000 and took a year to complete; however, as technology improves, demand increases and red tape is trimmed, market forces will continue to drive down costs and installation times will shrink.

According to clean energy advocacy group RMI, the cost of hardware components is already dropping as manufacturers streamline their internal processes; rather, soft costs associated with municipal and governmental regulations offer the greatest obstacle to cheaper installations. A report by Chris Nelder that RMI published in 2019 titled “Reducing EV Charging Infrastructure Costs” notes, “the costs of permitting delays, utility interconnection requests, [and] compliance with a balkanized framework of regulations… were frequently cited as more significant cost drivers than charging station hardware in the United States.”

However, LADOT’s enthusiasm in joining with EVCS to chart a path toward greater EV adoption offered us the opportunity to work with them on many of these issues, not only to eventually improve the entire installation process for all LA-based site hosts, but to serve as a national leader for other cities to emulate. Our hope is that such frank conversations will encourage more overall participation by speeding up permitting requests, simplifying regulations and allowing for more efficient allocation of public funding that makes the installation process shorter and less burdensome to site hosts.

For now, we’re just happy to be installing more chargers. City Lot 656 is one small example of what a private/public partnership can accomplish when all goals are aligned. Thank you again to the City of LA and its Department of Transportation for helping us pave new roads to the future!

Back
29
Jun
/
21
30
June
/
23
Electric Car Charging

“Who’s Saving the Planet?” Podcast Interviews Gustavo Occhiuzzo

EVCS co-founder and CEO Gustavo Occhiuzzo recently spoke on the “Who’s Saving the Planet?” podcast about the electric mobility revolution and what we as a company are doing to help realize a truly carbon-neutral future. During the conversation with hosts Anthony Noto and Jessica Miles, Occhiuzzo made several critical points that help listeners understand where we are now in that mission, the obstacles we face, what EVCS has done to overcome those obstacles, and what we can do better as a global community. Here are some of the most prescient points:

READ MORE
20
Jun
/
21
30
June
/
23
Electric Car Charging

Installation of the Month (June 2021): Hyatt Place Riverside/Downtown

The ability to travel is something many of us take for granted. Our Interstate Highway System allows us to freely traverse state boundaries – to go wherever we choose whenever we choose – from the snow-capped Colorado Rockies to the soupy Everglade swamplands to the historic lighthouses of coastal New England. However, EV drivers are more acutely aware of their travel limitations because many areas of the country have yet to adopt pro-electric infrastructure policies, often leaving them with few ground-travel options other than ICE vehicles. We knew getting more Americans to embrace the electric revolution would require buy-in from the hospitality industry. As such, much of our focus has gone toward hotels that, by serving as site hosts for charging stations, can help kickstart that ubiquitous access required to convert many EV holdouts.

READ MORE
13
Jun
/
21
30
June
/
23
Electric Car Charging

Wall Street Journal Piece Brings Up Questions… And We Answer

Stephen Wilmot’s recent article in the Wall Street Journal, “Investors Look for an EV Charge,” debates the merits of investing in EV infrastructure, admitting that while chargers likely make for better investments than cars, the sector still holds many potential pitfalls that should be considered before jumping in. While that may be true, many of the examples backing up this assertion cite the business models of the largest EV installers in the country while failing to consider what less visible but faster-growing companies like EVCS are doing to mitigate such risks. Below are a few quotes from the article and our thoughts on them, including how we’re different.

READ MORE
24
May
/
21
30
June
/
23
Electric Car Charging

Commentary on EV Industry Profitability Claims

In a recent Driving.ca article titled “EV-Charging Industry is Doing Everything Except Making Money,” author David R. Baker makes a compelling argument that the EV infrastructure sector is a revenue desert, essentially incapable of generating enough cash flow to sustain profitability due to a lack of interest from motorists. “The dilemma boils down to demand,” he states, before adding that “lots of people still driving gasoline-powered cars won’t consider going electric until they see charging stations widely deployed.”

READ MORE
16
May
/
21
30
June
/
23
Electric Car Charging

Addressing Pain Points in Creating EV Infrastructure

A recent GovTech.com article titled “How Biden Plans to Build 500 EV Charging Stations” discusses the President’s goals for creating a nationwide network of 500,000 such installations by 2030. While it does a smart job laying out many of the pain points we face in facilitating EV adoption, the mention of solutions was far less prevalent, and ones that were mentioned seemed speculative or tenuous. However, over the last three years, EVCS has already taken the lead in addressing many of these challenge areas, allowing us to dominate the installation market across the West Coast.

READ MORE